Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts

Henan Forging Emperor Industry Co.,Ltd.
  • Audited Supplier
  • 8 yrs

Contact Supplier

Still deciding? Get samples of $ !
Request Sample

Product Highlights

  • Multi-Industry Application: Suitable for Aerospace, Automotive, Medical, Robotics, and Agricultural sectors.
  • High Precision Tolerance: Machining tolerance ranges from 0.02mm to 0.1mm with high relative position accuracy.
  • Extensive Material Options: Available in Carbon Steel, Alloy Steel, and Stainless Steel (SS304/SS316).
  • Comprehensive Surface Treatment: Includes polishing, plating, powder coating, and painting to meet specific needs.
  • OEM and ODM Services: Custom manufacturing based on customer drawings and samples with flexible MOQ.
  • Rigorous Quality Control: Full process control from raw material testing to final strength and function checks.
  • Global Logistics Support: Shipping via sea or air from Qingdao, Tianjin, or Shanghai ports worldwide.
  • Advanced Heat Treatment: Options include normalization, quenching, case hardening, and nitriding.

Product Images of Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts

Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts pictures & photos
Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts pictures & photos
Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts pictures & photos
Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts pictures & photos
Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts pictures & photos
Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts pictures & photos
Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
  • Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
  • Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
    Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
  • Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
    Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
  • Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
    Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
  • Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
    Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
  • Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
    Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
  • Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts
    Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts

Find Similar Products

Product Description

CNC Machining

Customized Forged Butterfly Valve Rotor Shaft Motor Shaft PartsCustomized Forged Butterfly Valve Rotor Shaft Motor Shaft PartsCustomized Forged Butterfly Valve Rotor Shaft Motor Shaft PartsCustomized Forged Butterfly Valve Rotor Shaft Motor Shaft PartsCustomized Forged Butterfly Valve Rotor Shaft Motor Shaft PartsCustomized Forged Butterfly Valve Rotor Shaft Motor Shaft PartsCustomized Forged Butterfly Valve Rotor Shaft Motor Shaft PartsCustomized Forged Butterfly Valve Rotor Shaft Motor Shaft PartsCustomized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts

Process Machining,  CNC Turning,  CNC Milling
Material Carbon steel: 1020,1020,1035,1045,1055,Q235,Q345 etc., Alloy steel: 40Cr, 20CrMnTi, 20CrNiMo,
35CrMn,42CrMo4 etc.,
Stainless steel, SS304,SS316 etc.
Standard ISO, DIN, ASTM, BS ect.
Weight 0.1kg - 120kg
Applicable Machining Process CNC Machining/ Lathing/ Milling/ Turning/ Boring/ Drilling/ Tapping/ Broaching/Reaming etc.
Machining Tolerance 0.02mm-0.1mm
Machined Surface  Ra 0.8-Ra3.2 according to customer requirement
Applicable Heat Treatment Normalization , quenching and tempering, Case Hardening, Nitriding, Carbonitriding
Applicable Finish Surface Treatment Shot/sand blast, polishing, Surface passivation, Powder coating, E- Coating, Chromate Plating,
 zinc-plate, Dacromat, Painting,
Testing equipment Supersonic inspection machine, Supersonic flaw detecting machine , physics and chemical analysis.
Packing Wooden cases or according to customers' needs
Quality Control 1.Raw materials test,include chemical composition and size
2.Random inspection during production
3.Final products size test,with measurement tools,special gauges and coordinate instrument if needed
4.Final products strength and hardness test,to guarantee the mechanical property
5.Assembly and function test,with special testing gauges
6.Packing test
 
MOQ of mass production 1000-5000pcs
Logistics Shipping,Air flight,International express etc...

Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts1. How long does it take to receive samples?
A) Pattern: 30-45 days after order
B) Sample: 30 days after pattern finishing.
C) The lead time is the general production period and does not include the transportation time.
2. New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept. To ensure the developing schedule---Design mold, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the sample with initial inspection report.
3. How long is the manufacturing lead time?
Mass Production: 90 days after sample approval by yours. The lead time is the general production period including the transportation time. We could make some special production arrangement effectively if customer has urgent need.
4. How to deal with the quality problem?
A. We perform APQP at an early stage in each project.
B. Our factory must fully understand the quality concerns from customers and implement product & process quality requirements.
C. Our quality professionals who perform patrol inspection in our factories. We perform final inspection before the goods are packed.
D. We have inspectors who perform final audit checks on the packed goods prior to dispatch from China.
5.Can you take responsibility for me?
Of course, I'm happy to help you!But I just take responsibility for my products.Please offer a test report, if it was our fault, absolutely we can make a compensation for you, my friend!
6.What are the payment terms?
Payment terms are negotiable and will improve for long term customers.During the initial stages, we request 50% of tooling fee in advance with the balance payable on acceptance of samples.Production orders can be negotiable.We prefer 50% deposit and the balance by T/T before sails.But sometimes T/T15 days after sails would also acceptable.
7.How long does it take to ship goods from China by sea?
It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the
container within 6 to 7 weeks.It takes about 2 weeks to east coast and 3 weeks to west coast US ports.All sea goods are shipped from Qingdao Port.
8.How long does it take to ship goods from China by air?
It takes about 7 days to all major destinations.
9.Is there a minimum volume of business required to conduct international
purchasing?
There are no minimum volumes, but the prices of the goods, plus the fixed costs of importing makes it more economical to buy in high volumes.All potential customers will be assessed on an individual basis to determine if it appears a viable option for all parties to develop a relationship
All parts are custom made according to customer's drawings or samples.If you have any parts to be made, please feel free to send your kind drawings/samples to us.Technical drawings including material mark, Product weight, Purchase quantity.The comprehensive information will help us quickly calculate the accurate and reasonable price for you.
We are dedicated to provide you with quality products and services, welcome to inquire and order!

Customized Forged Butterfly Valve Rotor Shaft Motor Shaft Parts


 

About the Supplier

This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASR249976". Items marked "verified" are certified.

Watch Video
Watch Video
Henan Forging Emperor Industry Co.,Ltd.
Henan Forging Emperor Industry Co.,Ltd.
Henan Forging Emperor Industry Co.,Ltd.
Henan Forging Emperor Industry Co.,Ltd.
Henan Forging Emperor Industry Co.,Ltd.
Henan Forging Emperor Industry Co.,Ltd.
Henan Forging Emperor Industry Co.,Ltd.
Henan Forging Emperor Industry Co.,Ltd.

About Our Factory & Business Background

Address
369 Taikang East Road, Luolong District, Luoyang, Henan, China
Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
International Commercial Terms(Incoterms)
FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others
Average Lead Time
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Nearest Port
QINGDAO, TIANJIN, SHANGHAI

Our Production Capability & Technical Expertise

Main Products
Forging, Casting, Machining, Machining Parts, CNC Machining Parts, Casting Part, CNC Parts, Hot Die Forging, Machinery Parts, Customized Part

Our Industry Experience & Global Business Record

Export Year
2008-03-05
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

How long does it take to receive samples?
Pattern: 30-45 days after order. Sample: 30 days after pattern finishing. The lead time is the general production period and does not include transportation time.
How long is the manufacturing lead time?
Mass Production: 90 days after sample approval by yours. The lead time includes transportation time. Special arrangements can be made for urgent needs.
How to deal with quality problems?
We perform APQP early, conduct patrol inspections, final inspections before packing, and final audit checks prior to dispatch. If it is our fault, we provide compensation.
What are the payment terms?
Payment terms are negotiable. We prefer 50% deposit and balance by T/T before sails, but T/T 15 days after sails is also acceptable. Tooling fees require 50% deposit in advance.
How long does it take to ship goods from China by sea?
About 5 weeks to European ports plus 1 week customs clearance (6-7 weeks total). About 2 weeks to US East Coast and 3 weeks to US West Coast. Goods ship from Qingdao Port.
How long does it take to ship goods from China by air?
It takes about 7 days to all major destinations.
Is there a minimum volume of business required?
There are no minimum volumes, but buying in high volumes is more economical due to fixed import costs. All potential customers are assessed individually.
Can parts be custom made?
Yes, all parts are custom made according to customer's drawings or samples. Please provide technical drawings including material mark, weight, and quantity.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now