After-sales Service: | According to Customer Requirements |
---|---|
Warranty: | According to Customer Requirements |
Part: | According to Customer Requirements |
Material: | According to Customer Requirements |
Classification: | According to Customer Requirements |
Certification: | ISO/TS16949:2002, According to Customer Requirements |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Product Name | Input shaft | |
Main Process | OEM Precision CNC Machined Brass Hot Forging Valve Fittings Custom Brass Forgings Machining Parts CNC Machining PartHot Forging, Cold Forging, CNC Machining | |
Material | Carbon Steel, Stainless Steel, Aluminum Alloy Or according to customer requirements | |
Forging Weight Range | 10gram - 200kgs | |
Surface Finish | Pickling, Passivation, Sand-blasting, Shot-blasting, Electro-polishing, Buffing, Mirror-polishing, Zinc/Chrome Plating, Anodizing,Powder Coating,Electrophoretic painting etc. | |
Machining Process | CNC Machining/ Lathing/ Milling/ Turning/ Boring/ Drilling/ Tapping/ Broaching/Reaming | |
Machining Tolerance | 0.01mm-0.05mm | |
Heat Treatment | Solution, Annealing, Quenching, Tempering, Aging, etc. | |
Special Treatment | Hardening, Vacuum Impregnation, etc. | |
Special Inspection | Leakage test, Shell Strength test, Radiographic test, Ultrasonic test, Magnetic test, Liquid penetration test, Salt spray test, etc. |
|
Application | Petrochemical industry | |
Lead time | 35 days for mold and samples, after confirmation of samples, mass production time is 25 days | |
Small Quantity | Is acceptable | |
Quality Control | Full Inspection | |
item | value | |
Place of Origin | China | |
Brand Name | ||
Model Number | ANY TYPE | |
Model | Customizable | |
Name | Input shaft for machine | |
Material | Carbon steel | |
Color | According to customer requirements | |
Shape | According to the srawing | |
Characteristic | steel product | |
MOQ | 1000pcs | |
Keyword | Forging | |
Lead Time | 25~45 Days | |
Dimensions | Customers' Requiry | |
Application | Industry Equipments, Autos, Construction machinery Parts, Agricultural machinery, Railway relevant Parts, Petrochemical machinery, Mining machinery, The power industry. |
Henan Duanhuang industry Co., Ltd. Our company has been engaged in forging business for more than 20 years and has accumulated rich forging technology and experience.The company has a large number of experienced forging engineers and technical workers.Currently, our factory is installed with all kinds of forging equipment and processing machinery, which means we can produce forged parts from 0.1kg to 200kg in short time with large quantities.We have an professional industrial design team which can design products according to detail requirements from customers. Moreover, we can do secondary design improvements to old parts.The company has the ability to design and produce metal forging molds, which are the key tools in the manufacturing process of forging products.So we can control the product quality better.We have
U.S.A, Germany, France, Italy, UK, Brazil, Swedish, Japan, Korea, Middle east of Asia, Thailand.
A) Pattern:30-45days after order
B) Sample:30days after pattern finishing.
C) The lead time is the general production period and does not include the transportation time.
Got tooling order and sample order with 50% deposit-Hold a meeting with the relation dept.To ensure the developing schedule-Design mold, fixture and gauge and making them in our house-mold steel buying-Machining-Inspection-Send out the sample with initial inspection report.
Mass Production:90days after sample approval by yours.The lead time is the general production period including the transportation time.
We could make some special production arrangement effectively if customer has urgent need.
A.We perform APQP at an early stage in each project.
B.Our factory must fully understand the quality concerns from customers and implement product & process quality requirements.
C.Our quality professionals who perform patrol inspection in our factories.We perform final inspection before the goods are packed.
D.We have inspectors who perform final audit checks on the packed goods prior to dispatch from China.
Payment terms are negotiable and will improve for long term customers.During the initial stages, we request 50% of tooling fee in advance with the balance payable on acceptance of samples.Production orders can be negotiable.We prefer 50% deposit and the balance by T/T before sails.But sometimes T/T15 days after sails would also acceptable.
Of course, I'm happy to help you!But I just take responsibility for my products.Please offer a test report, if it was our fault, absolutely we can make a compensation for you, my friend!
8.HOW LONG DOES IT TAKE TO SHIP GOODS FROM CHINA BY SEA?
t takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container within 6 to 7 weeks.It takes about 2 weeks to east coast and 3 weeks to west coast US ports.All sea goods are shipped from Qingdao Port.
Suppliers with verified business licenses