Forged Alloy Steel Excavator Bucket Tooth Root

Product Details
Customization: Available
Processing Object: Metal
Molding Style: Forging
Still deciding? Get samples of US$ 5/Piece
Request Sample
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Experienced Team
The supplier has 6 foreign trading staff(s) and 5 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (14)
  • Forged Alloy Steel Excavator Bucket Tooth Root
  • Forged Alloy Steel Excavator Bucket Tooth Root
  • Forged Alloy Steel Excavator Bucket Tooth Root
  • Forged Alloy Steel Excavator Bucket Tooth Root
  • Forged Alloy Steel Excavator Bucket Tooth Root
  • Forged Alloy Steel Excavator Bucket Tooth Root
Find Similar Products
  • Overview
  • Product Description
  • FAQ
Overview

Basic Info.

Model NO.
L2024-6-4a
Molding Technics
Forging
Application
Machinery Parts, Fastener, Hardware Tool, Machinery Accessory, Mining Excavator
Material
Steel, Steel, Alloy, Iron, Differenty Types of Steels, Carbon Steel, Stainles
Heat Treatment
Quenching
Surface Treatment
Sand Blasting, Electroplating
Forging Tolerance
+/-0.5mm
Standard
GB, GB, En, China GB Code
Certification
ISO 9001:2000
Production Type
Single Production
Machining Method
Forging
Transport Package
Fiber Wooden Case
Specification
According to customer requirements
Trademark
JH
Origin
Luoyang, China
HS Code
8431499000
Production Capacity
500000 PCS/Year

Product Description

Product Description
Product Specification & Other information List:
1 Item Name Custom Forging Parts
2 Size As per Bucket teeth of various excavator models .
3 DRW Format DWG, PDF, IGS, STEP, SLDPRT, SLDDRW, PRT, DRW, DXF, X_T, etc...
4 Weight 3-20 kg
5 Material Differenty types of Steels,  Alloy Steel etc;, tungsten molybdenum alloy 
6 Application Industry Equipments, Mining ore excavator
7 Surface Treatment Self color, Polishing, Painting, Powder Coating, Electrophoretic Coating, Anodizing, Nickel Plating, Zinc Plating, Hot dip Galvanizing etc.
8 Quality Control 1.Raw Materials Test, include chemical composition and size;
2.Random inspection during production;
3.Final products size test, with measurement tools, special gauges and Coordinate instrument if needed;
4.Final products Strenght and Hardness test, to guarantee the mechanical property;
5.Assembly and Function test, with special testing gauges;
6.Packing test
9 Packing Plastic bags, Cartons, Racks, Plywood Cases etc.
10 Logistics Shipping, Air Flight, International Express etc.
11 Process Die Forging, Free Forging, Hot forging, Cold forging, Heat Treatment, Machining, Surface Treatment etc.
12 Certificate ISO/9001 ISO/IATF16949
13 Service Custom OEM/ODM metal parts processing, Whole Product assembly, 2D & 3D drawings design, International Delivery Logistics, Serivce before & after sales etc.




 






Forged Alloy Steel Excavator Bucket Tooth Root
Forged Alloy Steel Excavator Bucket Tooth Root
Forged Alloy Steel Excavator Bucket Tooth RootForged Alloy Steel Excavator Bucket Tooth RootForged Alloy Steel Excavator Bucket Tooth RootForged Alloy Steel Excavator Bucket Tooth RootForged Alloy Steel Excavator Bucket Tooth RootForged Alloy Steel Excavator Bucket Tooth Root

FAQ

1.Which countries do you export to?
U.S.A, Germany, France, Italy, UK, Brazil, Swedish, Japan, Korea, Middle east of Asia, Thailand,

2.How long does it take to receive samples?
A) Pattern:30-45days after order
B) Sample:30days after pattern finishing.
C) The lead time is the general production period and does not include the transportation time.

3.New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept.To ensure the developing schedule---Design mold, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the sample with initial inspection report.

4.How long is the manufacturing lead time?
Mass Production:90days after sample approval by yours.The lead time is the general production period including the transportation time.
We could make some special production arrangement effectively if customer has urgent need.

5 Hao to deal with the quality problem?
A.We perform APQP at an early stage in each project.
B.Our factory must fully understand the quality concerns from customers and implement product & process quality requirements.
C.Our quality professionals who perform patrol inspection in our factories.We perform final inspection before the goods are packed.
D.We have inspectors who perform final audit checks on the packed goods prior to dispatch from China.

6.Can you take responsibility for me?
Of course, I'm happy to help you!But I just take responsibility for my products.Please offer a test report, if it was our fault, absolutely we can make a compensation for you, my friend!

7.What are the payment terms?
Payment terms are negotiable and will improve for long term customers.During the initial stages, we request 50% of tooling fee in advance with the balance payable on acceptance of samples.Production orders can be negotiable.We prefer 50% deposit and the balance by T/T before sails.But sometimes T/T15 days after sails would also acceptable.

8.Which currency can we buy in?
We can deal in USD / Euro currency / RMB

9.How long does it take to ship goods from China by sea?
It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container within 6 to 7 weeks.It takes about 2 weeks to east coast and 3 weeks to west coast US ports.All sea goods are shipped from Qingdao Port.

10.How long does it take to ship goods from China by air?
It takes about 7 days to all major destinations.

11.Can we visit the factory to conduct an audit?
Yes, you are welcome to visit our factory.

12.How do we retain client confidentiality?
We are happy to sign Confidentiality Agreements with customers and will honor them.

13.Is there a minimum volume of business required to conduct international purchasing?
There are no minimum volumes, but the prices of the goods, plus the fixed costs of importing makes it more economical to buy in high volumes.All potential customers will be assessed on an individual basis to determine if it appears a viable option for all parties to develop a relationship.

All parts are custom made according to customer's drawings or samples.If you have any parts to be made, please feel free to send your kind drawings/samples to us.Technical drawings including material mark, Product weight, Purchase quantity.The comprehensive information will help us quickly calculate the accurate and reasonable price for you.




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier