Forging Precision Wheel Shaft Forgings Base

Product Details
Customization: Available
Transport Package: Fiber Wooden Case
Specification: According to customer requirements
Still deciding? Get samples of US$ 1/Piece
Request Sample
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Experienced Team
The supplier has 6 foreign trading staff(s) and 5 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (14)
  • Forging Precision Wheel Shaft Forgings Base
  • Forging Precision Wheel Shaft Forgings Base
  • Forging Precision Wheel Shaft Forgings Base
  • Forging Precision Wheel Shaft Forgings Base
  • Forging Precision Wheel Shaft Forgings Base
  • Forging Precision Wheel Shaft Forgings Base
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
Overview

Basic Info.

Model NO.
w-74
Trademark
DUANHUANG
Origin
Luoyang, China
HS Code
7326901900
Production Capacity
50000pieces/Year

Product Description

Product Description
 
Product Specification & Other information List:
1 Item Name Forging precision wheel shaft forgings base
2 Size As per approval product drawings.
3 DRW Format DWG, PDF, IGS, STEP, SLDPRT, SLDDRW, PRT, DRW, DXF, X_T, etc...
4 Weight 0.1-200 kg
5 Material Differenty types of Steels, Carbon Steel, Stainless Steel, Alloy Steel etc;Aluminum alloy, copper alloy, titanium alloy, tungsten molybdenum alloy and other non-ferrous metals.
6 Application Industry Equipments, Autos, Construction machinery Parts, Agricultural machinery, Railway relevant Parts, Petrochemical machinery, Mining machinery, The power industry.
7 Surface Treatment Self color, Polishing, Painting, Powder Coating, Electrophoretic Coating, Anodizing, Nickel Plating, Zinc Plating, Hot dip Galvanizing etc.
8 Quality Control 1.Raw Materials Test, include chemical composition and size;
2.Random inspection during production;
3.Final products size test, with measurement tools, special gauges and Coordinate instrument if needed;
4.Final products Strenght and Hardness test, to guarantee the mechanical property;
5.Assembly and Function test, with special testing gauges;
6.Packing test
9 Packing Plastic bags, Cartons, Racks, Plywood Cases etc.
10 Logistics Shipping, Air Flight, International Express etc.
11 Process Die Forging, Free Forging, Hot forging, Cold forging, Heat Treatment, Machining, Surface Treatment etc.
12 Certificate ISO/9001 ISO/IATF16949
13 Service Custom OEM/ODM metal parts processing, Whole Product assembly, 2D & 3D drawings design, International Delivery Logistics, Serivce before & after sales etc.
 
Detailed Photos

Forging Precision Wheel Shaft Forgings BaseForging Precision Wheel Shaft Forgings BaseForging Precision Wheel Shaft Forgings BaseForging Precision Wheel Shaft Forgings BaseForging Precision Wheel Shaft Forgings BaseHenan forging emperor Industry Co., Ltd. is a supplier specializing in metal forging, machining, casting and other machine parts customization.   We have been engaged in forging business for more than 20 years and has accumulated rich forging technology and experience.  we can produce forged parts from 0.1kg to 200kg in short time with large quantities.

The company has complete hardware supporting facilities, and undertakes customized OEM services for processing of incoming drawings and samples, and can complete all processes including 3D modeling design, mold design and production, product forging and pressing, heat treatment of forgings, and machining.



Forging Precision Wheel Shaft Forgings BaseForging Precision Wheel Shaft Forgings BaseForging Precision Wheel Shaft Forgings BaseForging Precision Wheel Shaft Forgings BaseForging Precision Wheel Shaft Forgings Base1.Which countries do you export to?
U.S.A, Germany, France, Italy, UK, Brazil, Swedish, Japan, Korea, Middle east of Asia, Thailand,

2.How long does it take to receive samples?
A) Pattern:30-45days after order
B) Sample:30days after pattern finishing.
C) The lead time is the general production period and does not include the transportation time.

3.New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept.To ensure the developing schedule---Design mold, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the sample with initial inspection report.

4.How long is the manufacturing lead time?
Mass Production:90days after sample approval by yours.The lead time is the general production period including the transportation time.
We could make some special production arrangement effectively if customer has urgent need.

5 Hao to deal with the quality problem?
A.We perform APQP at an early stage in each project.
B.Our factory must fully understand the quality concerns from customers and implement product & process quality requirements.
C.Our quality professionals who perform patrol inspection in our factories.We perform final inspection before the goods are packed.
D.We have inspectors who perform final audit checks on the packed goods prior to dispatch from China.

6.Can you take responsibility for me?
Of course, I'm happy to help you!But I just take responsibility for my products.Please offer a test report, if it was our fault, absolutely we can make a compensation for you, my friend!

7.What are the payment terms?
Payment terms are negotiable and will improve for long term customers.During the initial stages, we request 50% of tooling fee in advance with the balance payable on acceptance of samples.Production orders can be negotiable.We prefer 50% deposit and the balance by T/T before sails.But sometimes T/T15 days after sails would also acceptable.

8.Which currency can we buy in?
We can deal in USD / Euro currency / RMB

9.How long does it take to ship goods from China by sea?
It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container within 6 to 7 weeks.It takes about 2 weeks to east coast and 3 weeks to west coast US ports.All sea goods are shipped from Qingdao Port.

10.How long does it take to ship goods from China by air?
It takes about 7 days to all major destinations.

11.Can we visit the factory to conduct an audit?
Yes, you are welcome to visit our factory.

12.How do we retain client confidentiality?
We are happy to sign Confidentiality Agreements with customers and will honor them.

13.Is there a minimum volume of business required to conduct international purchasing?
There are no minimum volumes, but the prices of the goods, plus the fixed costs of importing makes it more economical to buy in high volumes.All potential customers will be assessed on an individual basis to determine if it appears a viable option for all parties to develop a relationship.

All parts are custom made according to customer's drawings or samples.If you have any parts to be made, please feel free to send your kind drawings/samples to us.Technical drawings including material mark, Product weight, Purchase quantity.The comprehensive information will help us quickly calculate the accurate and reasonable price for you.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier