Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power

Product Details
Customization: Available
After-sales Service: One Year After Sale Service
Warranty: One Year After Sale Service
Still deciding? Get samples of US$ 20/Piece
Request Sample
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Experienced Team
The supplier has 6 foreign trading staff(s) and 5 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (14)
  • Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power
  • Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power
  • Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power
  • Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power
  • Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power
  • Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
DH-09066
Material
Steel
Certification
ISO, GB
Automatic
Automatic
Standard
Nonstandard
Condition
New
Process
Forging+Machining(If Need)+Surface Treatment
Surface Treatment
Customers′ Demand
Tolerance
0.01mm~0.02mm
Service
OEM\ODM\Customized
Transport Package
Fiber Wooden Case
Specification
According to the drawing
Trademark
Forging Emperor
Origin
Luoyang, China
Production Capacity
50000PCS/Year

Product Description

Product Description
1 Product Name Rocker Arms
2 Material Alloy Steel, forged manufacturing process
3 Production Process

1. Material inspection

2. Heating and forging

3. Cooling and machining

4. Surface treatment

5. Testing and inspection

4 Custom Made Custom manufactured based on customer-provided drawings or specifications.
5 Performance Features

High Strength, Durability, High Toughness, Fatigue Strength, Impact Resistance, High Wear Resistance, Corrosion Resistance, High Temperature Resistance, Precision and Dimensional Accuracy

6 Certification and Standards Complies with ISO9001:2015 certification
7 Packaging and Shipping

Packaging: Rust-proof, wooden crate or pallet packaging

Shipping: Reliable logistics company chosen for secure transportation

8 Customer Service and Support

Technical support: Contact phone, email

Service: OEM/ODM

Detailed Photos
Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power
Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power
Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power
Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power
Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power
Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power


 
Packaging & Shipping

Packaging

1. Rust Prevention: Apply rust inhibitors or surface coatings to prevent oxidation and corrosion.

2. Appropriate Packaging Materials: Use materials such as wooden crates, pallets, or plastic packaging to protect the forgings from impact and vibration.

3. Padding and Cushioning Materials: Utilize materials like foam plastic or airbags to absorb and disperse impact during transportation.

 

Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and PowerAdvanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power

Shipping

1. Shipping Method: Sea Freight
2. Estimated Time: 25-30 days, specific timing subject to actual conditions

 

Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power

 

Company Profile

Henan Forging Emperor Industry Co., Ltd. is a manufacturer of forging parts located in Luoyang, which is a famous historical and cultural city in China. We have been engaged in forging parts business for 20 years.

     The company primarily focuses on design and production of industrial parts, auto parts, other mechanical parts, and special alloy forgings. Its products are predominantly utilized in the automobile industry, construction machinery industry, railway locomotive sector, electric power industry, petrochemical industry, and various other industries.The company boasts a comprehensive mechanical parts design and production process and is recognized a professional supplier of mechanical parts.
Advanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and PowerAdvanced Engineering Forged Rocker Arms for Increased Fuel Efficiency and Power

FAQ

1. Which countries do you export to?

USA, Germany, France, Italy, UK, Brazil, Sweden, Japan, Korea, Middle East Asia, Thailand.

2. How long does it take to receive samples?

A) Patterns: 30-45 days after order.

B) Samples: 30 days after pattern completion.

C) The lead time is the general production period and does not include transportation time.

3. New product development process

Receive tooling order and sample order with 50% deposit. Hold a meeting with the relevant department to ensure the development schedule. Design molds, fixtures, and gauges in-house. Purchase mold steel. Proceed with machining and inspection. Send out the sample with an initial inspection report.

4. How long is the manufacturing lead time?

For mass production: 90 days after sample approval by you. This lead time includes the general production period, including transportation time. We can make special production arrangements if there is an urgent customer need.

5. How to deal with quality problems?

A) We perform APQP at an early stage in each project.

B) Our factory must fully understand quality concerns from customers and implement product and process quality requirements.

C) Our quality professionals conduct patrol inspections in our factories and perform final inspections before packing goods.

D) Inspectors conduct final audit checks on packed goods before dispatch from China.

6. Can you take responsibility for issues?

Of course, I'm happy to assist you! However, I am responsible only for my products. Please provide a test report; if it's our fault, we can compensate you accordingly, my friend!

7. What are the payment terms?

Payment terms are negotiable and improve for long-term customers. Initially, we request 50% of the tooling fee in advance, with the balance payable upon acceptance of samples. Production orders are negotiable. We prefer a 50% deposit and the balance via T/T before shipment, but T/T 15 days after shipment is also acceptable.

8. Which currencies can we transact in?

We can transact in USD, Euro, or RMB.

9. How long does it take to ship goods from China by sea?

It takes approximately 5 weeks to European ports, plus 1 week for customs clearance, making it possible to receive the container within 6 to 7 weeks. To the east coast of the US, it takes about 2 weeks, and to the west coast, about 3 weeks. All sea freight is shipped from Qingdao Port.

10. How long does it take to ship goods from China by air?

It takes about 7 days to reach all major destinations.

11. Can we visit the factory for an audit?

Yes, you are welcome to visit our factory.

12. How do we maintain client confidentiality?

We are happy to sign confidentiality agreements with customers and will honor them.

13. Is there a minimum volume requirement for international purchasing?

There are no minimum volumes, but purchasing in larger volumes is more economical due to the prices of goods and fixed import costs. All potential customers will be assessed individually to determine if developing a relationship is viable for all parties.

        "If you have any parts that need to be manufactured, please feel free to send us your technical drawings or samples. Include details such as material specifications, product weight, and required quantity. Providing comprehensive information allows us to quickly calculate accurate and competitive prices for you."

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier