Power Fittings High Voltage Line Insulator Fittings Ball Head Ball Socket

Product Details
Customization: Available
Processing Object: Metal
Molding Style: Forging
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Experienced Team
The supplier has 6 foreign trading staff(s) and 5 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (14)
  • Power Fittings High Voltage Line Insulator Fittings Ball Head Ball Socket
  • Power Fittings High Voltage Line Insulator Fittings Ball Head Ball Socket
  • Power Fittings High Voltage Line Insulator Fittings Ball Head Ball Socket
  • Power Fittings High Voltage Line Insulator Fittings Ball Head Ball Socket
  • Power Fittings High Voltage Line Insulator Fittings Ball Head Ball Socket
  • Power Fittings High Voltage Line Insulator Fittings Ball Head Ball Socket
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
JH2024040501
Molding Technics
Forging
Application
Electric Power Fittings
Material
Steel
Heat Treatment
Quenching
Surface Treatment
Sand Blasting
Forging Tolerance
+/-0.5mm
Standard
GB
Certification
ISO 9001:2008
Service
OEM\ODM\Customized
Size
Customer′s Drawing Required
Process
Forging+Machining(If Need)+Surface Treatment
Performance Features
Corrosion-Resistant, Vibration-Resistant
Transport Package
Plywood Case
Specification
1kg
Trademark
Forging Emperor
Origin
Luoyang, China
Production Capacity
500000PCS/Year

Product Description

Product Description
1 Item Name Custom Forging Parts
2 Size As per approval product drawings.
3 DRW Format DWG, PDF, IGS, STEP, SLDPRT, SLDDRW, PRT, DRW, DXF, X_T, etc...
4 Weight 0.1-200 kg
5 Material Differenty types of Steels, Carbon Steel, Stainless Steel, Alloy Steel etc;Aluminum alloy, copper alloy, titanium alloy, tungsten molybdenum alloy and other non-ferrous metals.
6 Application Industry Equipments, Autos, Construction machinery Parts, Agricultural machinery, Railway relevant Parts, Petrochemical machinery, Mining machinery, The power industry.
7 Surface Treatment Self color, Polishing, Painting, Powder Coating, Electrophoretic Coating, Anodizing, Nickel Plating, Zinc Plating, Hot dip Galvanizing etc.
8 Quality Control 1.Raw Materials Test, include chemical composition and size;
2.Random inspection during production;
3.Final products size test, with measurement tools, special gauges and Coordinate instrument if needed;
4.Final products Strenght and Hardness test, to guarantee the mechanical property;
5.Assembly and Function test, with special testing gauges;
6.Packing test
9 Packing Plastic bags, Cartons, Racks, Plywood Cases etc.
10 Logistics Shipping, Air Flight, International Express etc.
11 Process Die Forging, Free Forging, Hot forging, Cold forging, Heat Treatment, Machining, Surface Treatment etc.
12 Certificate ISO/9001 ISO/IATF16949
13 Service Custom OEM/ODM metal parts processing, Whole Product assembly, 2D & 3D drawings design, International Delivery Logistics, Serivce before & after sales etc.
Detailed Photos

Power Fittings High Voltage Line Insulator Fittings Ball Head Ball Socket

Packaging & Shipping

Packaging

1. Rust Prevention: Apply rust inhibitors or surface coatings to prevent oxidation and corrosion.

2. Appropriate Packaging Materials: Use materials such as wooden crates, pallets, or plastic packaging to protect the forgings from impact and vibration.

3. Padding and Cushioning Materials: Utilize materials like foam plastic or airbags to absorb and disperse impact during transportation.
 

Shipping

1. Shipping Method: Sea Freight
2. Estimated Time: 25-30 days, specific timing subject to actual conditions

 

Company Profile

Production equipment:
300T/400T/630T/1000T/1600T/2500T/6300 ton screw press, hydraulic die forging hammer, CNC center, auto-lathes, punching, milling, grinding, drilling, polishing machine, heat treatment furnace, shot blasting maching.

Power Fittings High Voltage Line Insulator Fittings Ball Head Ball SocketPower Fittings High Voltage Line Insulator Fittings Ball Head Ball SocketPower Fittings High Voltage Line Insulator Fittings Ball Head Ball SocketPower Fittings High Voltage Line Insulator Fittings Ball Head Ball SocketPower Fittings High Voltage Line Insulator Fittings Ball Head Ball Socket

FAQ

1. Which countries do you export to?

USA, Germany, France, Italy, UK, Brazil, Sweden, Japan, Korea, Middle East Asia, Thailand.

2. How long does it take to receive samples?

A) Patterns: 30-45 days after order.

B) Samples: 30 days after pattern completion.

C) The lead time is the general production period and does not include transportation time.

3. New product development process

Receive tooling order and sample order with 50% deposit. Hold a meeting with the relevant department to ensure the development schedule. Design molds, fixtures, and gauges in-house. Purchase mold steel. Proceed with machining and inspection. Send out the sample with an initial inspection report.

4. How long is the manufacturing lead time?

For mass production: 90 days after sample approval by you. This lead time includes the general production period, including transportation time. We can make special production arrangements if there is an urgent customer need.

5. How to deal with quality problems?

A) We perform APQP at an early stage in each project.

B) Our factory must fully understand quality concerns from customers and implement product and process quality requirements.

C) Our quality professionals conduct patrol inspections in our factories and perform final inspections before packing goods.

D) Inspectors conduct final audit checks on packed goods before dispatch from China.

6. Can you take responsibility for issues?

Of course, I'm happy to assist you! However, I am responsible only for my products. Please provide a test report; if it's our fault, we can compensate you accordingly, my friend!

7. What are the payment terms?

Payment terms are negotiable and improve for long-term customers. Initially, we request 50% of the tooling fee in advance, with the balance payable upon acceptance of samples. Production orders are negotiable. We prefer a 50% deposit and the balance via T/T before shipment, but T/T 15 days after shipment is also acceptable.

8. Which currencies can we transact in?

We can transact in USD, Euro, or RMB.

9. How long does it take to ship goods from China by sea?

It takes approximately 5 weeks to European ports, plus 1 week for customs clearance, making it possible to receive the container within 6 to 7 weeks. To the east coast of the US, it takes about 2 weeks, and to the west coast, about 3 weeks. All sea freight is shipped from Qingdao Port.

10. How long does it take to ship goods from China by air?

It takes about 7 days to reach all major destinations.

11. Can we visit the factory for an audit?

Yes, you are welcome to visit our factory.

12. How do we maintain client confidentiality?

We are happy to sign confidentiality agreements with customers and will honor them.

13. Is there a minimum volume requirement for international purchasing?

There are no minimum volumes, but purchasing in larger volumes is more economical due to the prices of goods and fixed import costs. All potential customers will be assessed individually to determine if developing a relationship is viable for all parties.

        "If you have any parts that need to be manufactured, please feel free to send us your technical drawings or samples. Include details such as material specifications, product weight, and required quantity. Providing comprehensive information allows us to quickly calculate accurate and competitive prices for you."

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier