|
Still deciding? Get samples of $ !
Request Sample
|
| Customization: | Available |
|---|---|
| material: | Steel Alloy, Aluminum Alloy |
| Hardness: | High |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency






| Material | Aluminum (6061-T6, 6063, 7075-T6,5052) etc... Brass/Copper/Bronze etc... Stainless Steel (302, 303, 304, 316, 420) etc... Steel (mild steel, Q235, 20#, 45#) etc... Plastic (ABS, Delrin, PP, PE, PC, Acrylic) etc... |
| Process | CNC Machining, CNC turning, CNC milling, CNC lathe machining, CNC boring, CNC grinding, CNC drilling etc... |
| Surface treatment | Clear/color anodized; Hard anodized; Powder-coating; Sand-blasting; Painting; Nickel plating; Chrome plating; Zinc plating; Silver/gold plating; Black oxide coating, Polishing etc... |
| Gerenal Tolerance (+/-mm) |
CNC Machining: 0.005 Turning: 0.005 Grinding(Flatness/in2): 0.003 ID/OD Grinding: 0.002 Wire-Cutting: 0.002 |
| Certification | ISO 9001:2015 |
| Experience | 15 years of CNC machining products 3 years of automation machine manufacturing |
| Production capacity | depend on complicacy of different products and the quantity |
| Packaging | Standard: pearl cotton and bubble bag, carton box and seal For large and big quantity: pallet or as per customers' requirement |
| Lead time | In general:1-25days |
| Term of Payment | T/T, Paypal, Trade Assurance etc... |
| Minimum Order | Comply with customer's demand |
| Delivery way | Express(DHL,Fedex, UPS,TNT,EMS), By Sea, By air, or on your requirement |
| Product Name | Aluminium Machining Part |
| Tolerance | +/-0.01mm, 100% QC quality inspection before delivery, can provide quality inspection form. |
| MOQ | Low MOQ Start 1 Pcs ( No need mold cost ), Many Customers found us make prototype product to save Investment Funds for Pre-R&D and Market Testing. |
| Sample Cost | Free of Sample Cost. Normally is USD 35~110 per Style Of Special Design We Need Sample Charge, Can Refund when You Have Official Bulk Order. |
| Delivery Time | 1-25 days after order with prepayment based on product structure and quantity. |