Customization: | Available |
---|---|
After-sales Service: | One Year After Sale Service |
Warranty: | One Year After Sale Service |
Still deciding? Get samples of US$ 20/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
item | value |
Place of Origin | China |
Brand Name | |
Model Number | ANY TYPE |
Model | Customizable |
Name | Heavy Duty Shock Absorber Cushioning pad for railway |
Material | Carbon steel |
Color | According to customer requirements |
Shape | According to the drawings |
Characteristic | steel product |
MOQ | 1000pcs |
Keyword | Forging |
Lead Time | 25~45 Days |
Dimensions | Customers' Requiry |
Product Name | Heavy Duty Shock Absorber Cushioning pad for railway |
Main Process | OEM Precision CNC Machined Brass Hot Forging Valve Fittings Custom Brass Forgings Machining Parts CNC Machining PartHot Forging, Cold Forging, CNC Machining |
Material | Carbon Steel, Stainless Steel, Aluminum Alloy Or according to customer requirements |
Forging Weight Range | 10gram - 200kgs |
Surface Finish | Pickling, Passivation, Sand-blasting, Shot-blasting, Electro-polishing, Buffing, Mirror-polishing, Zinc/Chrome Plating, Anodizing,Powder Coating,Electrophoretic painting etc. |
Machining Process | CNC Machining/ Lathing/ Milling/ Turning/ Boring/ Drilling/ Tapping/ Broaching/Reaming |
Machining Tolerance | 0.01mm-0.05mm |
Heat Treatment | Solution, Annealing, Quenching, Tempering, Aging, etc. |
Special Treatment | Hardening, Vacuum Impregnation, etc. |
Special Inspection | Leakage test, Shell Strength test, Radiographic test, Ultrasonic test, Magnetic test, Liquid penetration test, Salt spray test, etc. |
Application | Railway and train |
Lead time | 35 days for mold and samples, after confirmation of samples, mass production time is 25 days |
Small Quantity | Is acceptable |
Quality Control | Full Inspection |