Automotive Industry Steering System Universal Forgings

Product Details
Customization: Available
Material: Zinc/Aluminum Alloy, Brass, etc
Tolerance: CT4-7 or as Requirements
Still deciding? Get samples of US$ 10/Piece
Request Sample
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Experienced Team
The supplier has 6 foreign trading staff(s) and 5 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (14)
  • Automotive Industry Steering System Universal Forgings
  • Automotive Industry Steering System Universal Forgings
  • Automotive Industry Steering System Universal Forgings
  • Automotive Industry Steering System Universal Forgings
  • Automotive Industry Steering System Universal Forgings
  • Automotive Industry Steering System Universal Forgings
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Company Profile
Overview

Basic Info.

Model NO.
w-55
Machining
Turning, Cutting, Milling, Grinding and Drilling
Transport Package
Fiber Wooden Case
Specification
According to customer requirements
Origin
Luoyang, China
HS Code
7306900090
Production Capacity
50000pieces/Year

Product Description

Product Description
 
Product Information
Product Name Automotive industry steering system universal forgings
Quotation According To Your Drawing(Size / Material / Required Technology / Etc.)
Drawing Formats 2D(PDF/CAD) And 3D(STP / STEP)
Materials Aluminum / Stainless Steel / Steel / Brass / Copper / Plastic / Iron / Alloy / Zinc / Etc. Other Special Materials:Nylon/Titanium/Lucite/Etc.
Main Process CNC Turning / Milling / Drilling / Bushing / Auto Lathe / Surface Treatment / Etc.
Tolerance ±0.02MM
Production Process Receive 3D Drawing-Write Processing Program-Processing-Quality Inspection-Packaging-Shipment
Testing Requirement CMM / Tool Microscope / Multi-Joint Arm / Automatic Height Gauge / Manual Height Gauge / Dial Gauge / Marble Platform / Roughness Measurement
Packing PePallet Carton / Fiber Wooden Case
Delivery Shipped within 30-45 Days After Placing The Order
Detailed Photos

Automotive Industry Steering System Universal ForgingsAutomotive Industry Steering System Universal ForgingsAutomotive Industry Steering System Universal ForgingsAutomotive Industry Steering System Universal ForgingsAutomotive Industry Steering System Universal Forgings
Company Profile

Henan forging emperor industry Co., Ltd.  Our company has been engaged in forging business for more than 20 years and has accumulated rich forging technology and experience. The company has a large number of experienced forging engineers and technical workers. Currently, our factory is installed with all kinds of forging equipment and processing machinery, which means we can produce forged parts from 0.1kg to 200kg in short time with large quantities.

We have an professional industrial design team which can design products according to detail requirements from customers.   Moreover, we can do secondary design improvements to old parts.  The company has the ability to design and produce metal forging molds, which are the key tools in the manufacturing process of forging products.  So we can control the product quality better.  We have excellent machining equipment that can meet the assembly requirements of customers' products.   It can be assembled directly after purchase.  The company can design and produce forging products with complex structure, and the product surface is beautiful without defects.
The company has a perfect order processing process to ensure the timely delivery of each order.  The company has a professional business service team to provide customers with timely and comprehensive services.
 

Automotive Industry Steering System Universal ForgingsAutomotive Industry Steering System Universal ForgingsAutomotive Industry Steering System Universal ForgingsAutomotive Industry Steering System Universal Forgings1.Which countries do you export to?
U.S.A, Germany, France, Italy, UK, Brazil, Swedish, Japan, Korea, Middle east of Asia, Thailand,

2.How long does it take to receive samples?
A) Pattern:30-45days after order
B) Sample:30days after pattern finishing.
C) The lead time is the general production period and does not include the transportation time.

3.New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept.To ensure the developing schedule---Design mold, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the sample with initial inspection report.

4.How long is the manufacturing lead time?
Mass Production:90days after sample approval by yours.The lead time is the general production period including the transportation time.
We could make some special production arrangement effectively if customer has urgent need.

5 How to deal with the quality problem?
A.We perform APQP at an early stage in each project.
B.Our factory must fully understand the quality concerns from customers and implement product & process quality requirements.
C.Our quality professionals who perform patrol inspection in our factories.We perform final inspection before the goods are packed.
D.We have inspectors who perform final audit checks on the packed goods prior to dispatch from China.

6.Can you take responsibility for me?
Of course, I'm happy to help you!But I just take responsibility for my products.Please offer a test report, if it was our fault, absolutely we can make a compensation for you, my friend!

7.What are the payment terms?
Payment terms are negotiable and will improve for long term customers.During the initial stages, we request 50% of tooling fee in advance with the balance payable on acceptance of samples.Production orders can be negotiable.We prefer 50% deposit and the balance by T/T before sails.But sometimes T/T15 days after sails would also acceptable.

8.Which currency can we buy in?
We can deal in USD / Euro currency / RMB

9.How long does it take to ship goods from China by sea?
It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container within 6 to 7 weeks.It takes about 2 weeks to east coast and 3 weeks to west coast US ports.All sea goods are shipped from Qingdao Port.

10.How long does it take to ship goods from China by air?
It takes about 7 days to all major destinations.

11.Can we visit the factory to conduct an audit?
Yes, you are welcome to visit our factory.

12.How do we retain client confidentiality?
We are happy to sign Confidentiality Agreements with customers and will honor them.

13.Is there a minimum volume of business required to conduct international purchasing?
There are no minimum volumes, but the prices of the goods, plus the fixed costs of importing makes it more economical to buy in high volumes.All potential customers will be assessed on an individual basis to determine if it appears a viable option for all parties to develop a relationship.

All parts are custom made according to customer's drawings or samples.If you have any parts to be made, please feel free to send your kind drawings/samples to us.Technical drawings including material mark, Product weight, Purchase quantity.The comprehensive information will help us quickly calculate the accurate and reasonable price for you.
 
We are dedicated to provide you with quality products and services, welcome to inquire and order!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier